Raised Floor Preparation:-As most cabling and electrical works will be placed under raised floor system, trunkingand cabling tray are installed at first.-Then, pedestals are placed in marked position. |
| Raised Floor Alignment:-Laser alignment tools will be used for better alignment of the raised floor system. |
| Raised Floor Alignment:-Long wood will also be used for better alignment of the raised floor system. |
Thermal insulation:
-Supply & install thermo insulation fiberglass on the structural floor (typically for down flow CRAC unit) |
Raised Floor VCable Cutout:
-Machine for cutting cable cutout |
Raised Floor Board:
2 types of raised floor plate will be used:
-Plain type
-Perforated or Air-grilled type (for down flow CRAC machine) |